US-NY / STATEN ISLAND

112 INDUSTRIAL LOOP

112 INDUSTRIAL LOOP

Non-Refrigerated Warehouse地点精度: pending

この物件の順位

基本情報
延床面積
2,746.77 ㎡
建築面積
敷地面積
高さ
階数
構造
竣工
認証・評価unknown / —
Energy Star Score
75 /100

Self-reported via NYC Local Law 84 annual benchmarking. Reflects building energy + water use as filed; later system changes are not retroactively captured.

エネルギー性能unknown / —
Site EUI
94.01 kWh/m²
Source EUI
146.37 kWh/m²
排出量2022 報告年
GHG emissions (total, location-based)
54,900 kg CO₂e/yr
GHG emissions (direct)
33,300 kg CO₂e/yr
GHG emissions (indirect)
21,600 kg CO₂e/yr
位置情報

ジオコーディング失敗・住所未取得

出典 / 元データ
データ最終取得: 2026-06-05 (今日)データに誤りを報告 →
元データ(CSV 列)
元データの列を表示 (234 個)
adult_education_gross_floor
Not Available
alert_data_center_issue_with
Ok
alert_energy_meter_has
Ok
alert_energy_meter_has_gaps
Ok
alert_energy_meter_has_less
Ok
alert_energy_meter_has_single
Ok
alert_energy_no_meters
Ok
alert_gross_floor_area_is
Ok
alert_property_has_no_uses
Ok
alert_water_meter_has_less
Possible Issue
ambulatory_surgical_center
Not Available
annual_maximum_demand_kw
Not Available
annual_maximum_demand_meter
Not Available
annual_maximum_demand_mm
Not Available
automobile_dealership_gross
Not Available
avoided_emissions_offsite
0
avoided_emissions_onsite
Not Available
avoided_emissions_onsite_1
0
bank_branch_gross_floor_area
Not Available
barracks_gross_floor_area
Not Available
borough
STATEN IS
college_university_gross
Not Available
community_board
503
construction_status
Existing
convention_center_gross_floor
Not Available
council_district
51
courthouse_gross_floor_area
Not Available
ct2020
22602
data_center_cooling_equipment
Not Available
data_center_energy_estimates
Not Available
data_center_gross_floor_area
Not Available
data_center_it_energy
Not Available
data_center_it_equipment
Not Available
data_center_it_site_energy
Not Available
data_center_it_source_energy
Not Available
data_center_national_median
Not Available
data_center_pdu_input_meter
Not Available
data_center_pdu_output_meter
Not Available
data_center_pue
Not Available
data_center_ups_output_meter
Not Available
data_center_ups_system
Not Available
default_values
FALSE
diesel_2_use_kbtu
Not Available
direct_ghg_emissions_intensity
1.1
distribution_center_gross
Not Available
district_chilled_water_use
Not Available
district_hot_water_use_kbtu
Not Available
district_steam_use_kbtu
Not Available
electricity_use_generated
Not Available
electricity_use_generated_1
Not Available
electricity_use_generated_2
Not Available
electricity_use_generated_3
Not Available
electricity_use_grid_purchase
255152.8
electricity_use_grid_purchase_1
74781
electricity_use_grid_purchase_2
74781
electricity_use_grid_purchase_3
255152.8
electricity_weather_normalized
74781
electricity_weather_normalized_1
2.5
enclosed_mall_gross_floor
Not Available
energy_power_station_gross
Not Available

…他 174 個(プレビューは 60 個まで)